Development Details

Home » Development Plan » Development Details

The long term Master Plan for the port expansion at Newpriok Terminal accommodates the following terminals :

Terminals Accommodated in the Long Term Master Plan

Terminal

Type

Capacity

Draft

Length

Container Terminal 1

Container

1,500,000 TEU/year

16.0m

850 m

Container Terminal 2

Container

1,500,000 TEU/year

16.0m

800 m

Container Terminal 3

Container

1,500,000 TEU/year

16.0m

800 m

Container Terminal 4

Container

2,000,000 TEU/year

16.0m

1000 m

Container Terminal 5

Container

2,000,000 TEU/year

16.0m

1000 m

Container Terminal 6

Container

2,000,000 TEU/year

16.0m

1000 m

Container Terminal 7

Container

2,000,000 TEU/year

16.0m

1000 m

Product Terminal 1

Petroleum Products

500,000 m3

19.0m

800m

Product Terminal 2

Petroleum Products

500,000 m3

19.0m

800m

 

The long term Master Plan also includes the following supporting infrastructure:

  • An access Road to provide access from a site east of the existing Port of Tanjung Priok
  • Appropriate security of power supply to sustain the expansion of the port
  • Appropriate security of potable and other water supply to sustain the expansion of the port
  • Appropriate security of waste water and waste disposal to sustain the expansion of the port


Share :